Planning Board Meeting
The meeting of the
Hickey opened the Public Comment period.
As there was no one present who wished to speak, Dankert moved to close the Public Comment period. Seconded by Klepack. All aye.
Public Hearing -
Amendment to Shannon Park PDA:
The
next item on the agenda was a Public Hearing to consider a proposed amendment
of the Shannon Park Planned Development Area by Steve Cardamone pertaining to
the parcel referred to in the Shannon Park Planned Development Area as “The
Hamlet” (Tax Parcel No. 47.1-6-58.1).
The proposal involves the subdivision of the parcel into smaller parcels
for sale to individual owners as 16 town houses with a small amount of land
attached to each unit and residual land and infrastructure owned in
common. The Final Plat will be
considered.
Hickey
stated the Preliminary Plat has been approved with 19 conditions some of which
required changes to be incorporated into the Final Plat . Tonight there would be a review of the Final
Plat to see if those conditions have been met.
If the conditions have not been met by the developer, another meeting
will be scheduled. If the conditions have
been met, then the Planning Board must make a recommendation to the Board of
Trustees for final approval.
For
the developers, Jim Finnegan distributed site revisions to the Final Plat which
addressed snow removal. Finnegan stated
he would limit his comments tonight to material not presented in the
Preliminary Plat approval stage.
Finnegan
stated
Hickey
opened the Public Hearing.
Lou
Gentsch,
Douglas
Heckathorn of
Heckathorn
asked about the elevation of the berms and how much screening they would
provide. Curtis stated the maximum
height of house in the Residential Districts is 35 feet. Finnegan stated the
Gentsch
asked about the drainage in the wet areas where the berms are proposed. Finnegan responded the water would be carried
by the swale.
Heckathorn
‘s wife, Susan Lobello, expressed concerns about approving the entire project
with 16 individual units. She would like
to see townhouse units 13, 14, 15 and 16 eliminated which would significantly
diminish the impact on the neighbors on
There
being no one else who wished to speak, Klepack moved to close the Public Hearing. Seconded by Piscopo. Ayes by Dankert, Hickey, Klepack, Piscopo and
Stycos. Motion carried.
Cross
gave his Engineer’s Report next stating
there are few new comments. Cross
originally noted the gravity portion of the sewer flowed from west to east and
then joined the
Cross
has also spoken with Reinhart. Cross
wanted to confirm that the water system would be dedicated to the Village to
meet health requirements but the sewer system would remain with the Homeowner’s
Association up to the point where it connects with
Regarding
the snow plow turnaround, Cross has spoken with Reinhart. Reinhart noted that the plows push to the
right and that is where the snow should be piled rather than across the road to
the left. Finnegan stated he would work
further on the snow removal and storage plan for the proposed development and
Cross
discussed the issue of the water main being under the pavement. The road would be maintained by the
Homeowner’s Association. In the future
should there be a problem with the water main and the Village had to repair the
water lines, the Village would do the
actual repairs to the line at no expense to the Homeowners Association, but the
Homeowners Association would be responsible for repairing the road
surface. This will be written into the
Homeowners Association bylaws and offering plan. This was agreeable to Cardamone.
The
Board then reviewed the following 19 proposed Conditions of Final Plat
Approval:
CONDITIONS OF FINAL PLAT
APPROVAL
FOR THE
HAMLET
STAGE 2 SUBDIVISION/SHANNON PARK PDA AMENDMENT
1. Final approval by the
Village Engineer of the Final Subdivision Plat and supporting
design/specification documents, including, but not limited to, plans and
specifications for drainage ways, storm water management/retention areas,
erosion control, public utilities (water lines to be located within the paved
area of the private and public streets), streets (public and/or private), and
intersection layouts, emergency access and snow removal.
2. Final approval by the
Village Attorney of conveyance and/or dedication documents in favor of the
Village, including, but not limited to, documents providing for the conveyance
and/or dedication, to the extent required in accordance with the approval of
the Final Subdivision Plat, of streets, storm water management/retention areas
(and easements or rights-of-way thereto), utilities, recreational areas,
parklands, trail areas, open space and easements, together with any restrictive
covenants or other conditions related thereto.
3. Final approval by the
Village Attorney of (i) any Offering Plan submitted to the State of New York
for approval, (ii) any restrictive covenants applicable to the subdivided
parcels, (ii) any documents and/or agreements applicable to any homeowners
association or similar entity to be formed, (iv) any provisions applicable to
such association or entity as to its obligations to properly maintain all
commonly owned areas (including, but not limited to streets and storm water
management facilities), and in the case of its default with respect to such
obligations, the rights of the Village to perform such duties (and gain access
for such purpose) and impose the costs thereof upon such association or entity,
and (v) any limited access restrictions associated with entry into the
subdivision (including, but not limited to, a gated entry system)..
4. Compliance, to the extent
applicable, with the general requirements and design standards and other
conditions of Article 300 and Article 400 of the Village Land Subdivision
Regulations.
5. Compliance with Section 306
of the Village Land Subdivision Regulations as to letter of credit and related
financial security requirements.
6. Availability for the
proposed residential development of (i) sufficient sewer units/permits and (ii)
sufficient capacity by all other utility providers (e.g., Southern Cayuga Lake
Intermunicipal Water Commission, NYSEG), and the inclusion of the following
note to be set forth on the Final Subdivision Plat:
A building permit for an approved lot on this Final
Subdivision Plat shall be issued only if the necessary sewer unit/permit is
available for the residential improvements proposed for such lot. The approval by the Planning Board of this
Final Subdivision Plat shall not be deemed to constitute or be evidence of the
current or future availability of any such required sewer units/permits.
7. Approval by the Village
Engineer of infrastructure (e.g., streets, public utilities, etc.) construction
plans and schedules, including, but not limited to, ingress and egress of
construction vehicles and equipment, signage, scheduling, and the coordination
of all work related thereto with the construction of storm water
management/retention and erosion controls.
8. Approval from the Village
Board of Trustees as required in conjunction with the proposed subdivision
constituting a minor amendment of the Planned Development Plan for the Shannon
Park Planned Development Area.
9. Approvals from all other
required governmental agencies, including, but not limited to, the Tompkins
County Health Department
10. Inclusion on the Final
Subdivision Plat of the following note:
The approval by the Village of Lansing Planning Board of this Final
Subdivision Plat shall not be deemed to constitute or be evidence of any
acceptance by the Village of Lansing of any street, easement or other open
space shown on this plat (see Section 313.01 of the Village of Lansing Land
Subdivision Regulations).
11. Inclusion on the Final
Subdivision Plat of the following note:
The Shannon Park Planned Development Area shall be
subject to annual review by the Planning Board, and action by the Board of Trustees,
until it is completed in accordance with the Final Development Plan or an
approved modification of said Final Development Plan.
12. Submission of the Final
Subdivision Plat for review by the Lansing Fire Chief as to emergency access
availability and any limited access restrictions associated with entry into the
subdivision (including, but not limited to, a gated entry system), and
implementation on the Final Subdivision Plat of all modifications required as a
result of such review.
13. Approval by Village Planning
Board of a Landscape Plan (i) indicating all trees greater than 24” in diameter
at breast height to be removed and (ii) new trees and plants to be installed.
Screening trees shall be spaced apart not farther than 15’ o.c.
14. Filing of a notice with the NYSDEC of a sedimentation, erosion and
pollution prevention and control plan, including the name of a specific person
designated to perform inspections related thereto and provide weekly reports to
the Village.
15. Construction of all infrastructure in compliance with standards and
specifications
provided for in the
Regulations.
16. Compliance with Section 202.045 of the
17. The final plat shall reflect
a southerly extension of Wedgewood Drive as a public road (which extension
shall be dedicated to the Village and shall be set forth on the Final
Subdivision Plat with a full metes and bounds description) for a distance
determined by the Village Engineer so as to create a snowplow deposit and
turnaround area sufficient for public plowing of that area.
18. The Final Subdivision Plat
shall be deemed to have received final approval only upon compliance with
Section 312.01 of the Village Land Subdivision Regulations.
19. Recording
in the Tompkins County Clerk’s Office of a copy of these conditions of final
subdivision plat approval, which copy shall be (i) recorded concurrently with
the filing of the Final Subdivision Plat, and (ii) indexed to the deed from
William H. Edelman and Audrey M. Edelman et al to Stephen J. Cardamone, dated
May 2, 1988, and recorded in the Tompkins County Clerks Office in Liber 635 of
Deeds at Page 581. In addition thereto, the following note shall be set forth
on the Final Subdivision Plat:
See Conditions of Final Plat Approval recorded
concurrently with the filing of this Final Subdivision Plat in the
Proof
of the filing of the Final Subdivision Plat and the recording of a copy of
these conditions of final subdivision plat approval shall be delivered to the
Village Zoning Officer immediately following such filing and recording.
With
regard to Item #1, Board members reiterated that the Village wanted to control
the roads up to the snow storage area at the entrance to the Hamlet. This road must meet Village specs. More
details would be required for the storm water management plan. With regard to
Item #7, plans for construction and
schedules would be needed. With regard to Item #12, the Fire Chief must review the proposed gate
and road plans. With regard to Item #13,
Hickey reiterated the statements made by the audience about saving as
many trees as possible. Hickey noted all
trees of 6” in diameter at breast height were not indicated on the plans
although the 24” larger trees were depicted.
Board members would like more information on the proposed screening
pines. With regard to Item #14, filing
of Notice with the NYSDEC has not been completed yet and must be done before
the Plat can be signed. Also the Final Plat must note there are conditions
attached. The Homeowners Association must include provision for road repair in
case of water repairs by the Village in their bylaws and/or offering plan. The Board would also like additional
information on the gating concept and trails. George Buchanan,
This
will be placed on agenda for June 14th if the developer is
ready.
The next item on the agenda was a Public Hearing to
consider the Final Plat Approval of the Spitsberg Subdivision, a major
subdivision dividing a 7.11 acre lot into seven building lots and two residual
parcels with a short cul-de-sac road.
The lot to be subdivided fronts on
Gary
Wood, Engineer, gave the presentation responding to the previous concerns of
the Board. Wood stated the subdivision
will have 7 lots with a 500ft. cul-de-sac with open area in the middle for snow
storage. There will be a relocation of a
stream, and storm water retention provided at the bottom of the lots. Wood noted that Spitsberg will be the builder
as well as the developer. Hickey asked
about the two residual parcels mentioned in the legal notice. Curtis stated they would be owned by the
Village and one is the retention area.
Hickey
opened the Public Hearing.
Wayne
Knoblauch,
There
being no one else who wished to speak, Dankert moved to close the Public
Hearing. Seconded by Stycos. Ayes by Dankert, Hickey, Klepack, Piscopo and
Stycos. Motion carried.
Next
the Board reviewed proposed Conditions of Final Plat Approval. (1) Final
Approval by Village Engineer. Cross has
walked the property with Wood, Spitsberg and Furry and confirms the report from
Wood. Cross stated there are no
significant changes. Curtis stated the
fire truck will not hook up to the hydrant on
Next
the Board discussed the fees in lieu of recreation land. After discussing the need for recreation
facilities, Klepack moved that the Board has determined that there is a need
for access to recreation by residents who will live in the Spitsberg
Subdivision. Seconded by Stycos. Ayes by Dankert, Hickey, Klepack, Piscopo and
Stycos. Motion carried.
Hickey stated that the proposed subdivision
does not have land suitable for recreation purposes due to density of dwelling
units, topography, wet condition, requirement for drainage sites. Klepack asked about accessing the trail
system. Curtis noted there would be an
easement at the end of the cul-de-sac which could connect to the Millcroft
Subdivision if a bridge were placed across the stream. Cross was unsure that they would
connect. A possible remedy would be to
reduce
Klepack
moved that the Village would accept monies in lieu of recreation land due to
the reasons of topography, wet land drainage areas, and access to greenway
trails already designated. Seconded by
Stycos. Ayes by Dankert, Klepack,
Hickey, Piscopo and Stycos. Motion
carried.
The
Board then continued with the 19 proposed conditions. (16) Inclusion on Final Plat of a note
regarding soil, surface and groundwater conditions. Tompkins County Soil Survey shows three soil
types on this site. They overlay a
hardpan, however, which limits vertical drainage. Consequently, it is important that proper
grading, landscaping and foundation drainage be provided. (17) Construction of all infrastructure in
compliance with Subdivision Regulations. Not discussed. (18) Recording in
Hickey
noted that due to outstanding items, the discussion will continue at the next
meeting. Outstanding items include DEC
permit for stormwater management and stream relocation, Landscape Plan,
Redesign of Lot 4, and the Hydrology Report.
Relocation of stream is extremely important and the Board would like to
see a response from the DEC prior to the Board’s approval. Dubow stated an extension may be granted if
required. Hickey also noted the Board
may give a conditional approval subject to receipt of the DEC Permit.
Hickey
can provide a conditional approval to John Andersson at the Health Department
when the Board approves the subdivision.
Hickey noted that he does not sign the Final Plat until the signature of
the Health Department is in place. Dubow
stated Andersson is aware of the procedures in the Village.
Approval of Minutes – April 27th
& May 10th:
Klepack
moved to approve the minutes of April 27th as revised. Seconded by Piscopo. Ayes by Dankert, Hickey, Klepack, Piscopo and
Stycos. Minutes approved.
Dankert moved to approve the minutes of May 10th
as revised. Seconded by Klepack. Ayes by Dankert, Hickey, Klepack, Piscopo and
Stycos. Minutes approved.
Other Business as Time
Permits:
Dankert
is unable to attend a green walkway workshop in
Anne
Furry expressed concerns about the cumulative traffic impact of development in
the Village. The Spitzberg Subdivision
in the Medium Density District would create 7 lots which would allow up to 14
units having two cars each which could generate trips by an additional 28
vehicles. Furry felt the Board should
review the Zoning Law and consider possible zoning changes to limit density,
thereby limiting the number of vehicles.
Adjournment:
Klepack moved to adjourn at 10:00 P.M. Seconded by Piscopo. All aye.